Business Areas
New Global Leader, STX Engine

Stationary Power Generation Engine

STX Engine's power generation business has been expanding into the environmentally friendly power generation business which uses LNG, Bio-fuel, etc., based on its technologies and know-how accumulated over 30 years as well as customer-oriented optimized engineering capability.

  • High Speed Engine 1
  • High Speed Engine 2
  • High Speed Engine 3
  • High Speed Engine 4

Introduction to Products

A high speed engine power plant, which applies the system engineering technology accumulated for more than 30 years and diesel engines of domestic and overseas engine makers, is supplied as an emergency power supply for various industrial facilities as well as commercial and residential areas including power plants, oil refineries, office buildings, apartment houses, etc. Recently, 10~20MW class black start diesel generators (BSDGs) are supplied which are essential for restarting the gas turbine power plant during large scale blackout.

Emergency Diesel Generator (EDG)
An emergency diesel generator (EDG) is supplied mainly to power plants, oil refineries, hospitals, Internet data centers (IDC), office buildings, apartment houses, etc. STX Engine is supplying reliable products designed with accumulated design capability.
Black Start Diesel Generator (BSDG)
A black start diesel engine generator (BSDG) is essential in order to start a gas turbine generator during a large scale blackout. Over the past 10 years, the demand on BSDGs are increasing overseas.
Mainly, a high speed engine is applied to its design. However, if requested by a customer, it is possible to apply a medium speed engine, providing customers with various options.

Model and Capacity

Model and Capacity

Major Supply Record

Year Project Contractor Country Unit Output
(KW)
Quantity Total Output
(KW)
Purpose
2019 Melaka CCPP Hyundai Engineering Malaysia 2,400 9 21,600 BSDG
2016 Kirikkale IPP Samsung C&T Turkey 1,500 1 1,500 EDG
2016 Safi IPP Daewoo E&C Morocco 1,100 2 2,200 EDG
2015 Incheon LNG Terminal STX Heavy Industries Korea 7,200 2 14,400 EDG
2015 Chile Kelar CCPP Samsung Engineering Chile 2,000 3 6,000 BSDG
1,200 1 1,200 EDG
2017 Algeria Mega Deal Project(NAAMA) Samsung C&T Algeria 2,000 7 14,000 BSDG
2016 Algeria Mega Deal Project(MOSTAGANEM) Samsung C&T Algeria 2,000 7 14,000 BSDG
2017 Algeria Mega Deal Project(KAIS) GS E&C Algeria 2,000 8 16,000 BSDG
2015 MIRFA IWPP Hyundai E&C UAE 2,000 4 8,000 BSDG
2014 Aramco Third Party Cogen Samsung Engineering Saudi Arabia 1,000 2 2,000 EDG
600 1 600 EDG
2014 Taean IGCC Korea Western Power Korea 2,500 1 2,500 EDG
2013 Samcheok LNG Terminal Korea Gas Corporation Korea 7,200 1 7,200 EDG
2012 Shoaiba II CCPP Daelim Industrial Saudi Arabia 4,000 2 8,000 BSEDG
2012 Black Gold Project GS E&C Canada 1,800 1 1,800 EDG

Contact Point

Responsible Person Department Tel E-mail
Mr. Jung Dae Seo

Power Generation Biz. Team

+82-55-280-0853 jdseo@onestx.com

Customer Sign in


Welcome to STX Engine Web.
As a registered customer or other business partner with STX Engine, STX Engine Web gives you various technical and service information. Please sign in with your registered email.

* Not registered?    Sign up now!
* Member Withdrawal.

Cancel

Create Account


If you would like to have access to STX Engine Web, please fill out the fields below using your company details.

* 

* 

* 

    
Cancel

Notice !


Please check your email from STX Engine Web and click on the link for email address confirmation. Then, please wait until administrator approval.

Notice !


Email is not registered or entered incorrectly!

Notice !


Please proceed with the email authentication first!

Notice !


Email authentication status. Waiting for approval!

Notice !


This email is already registered!

Member Withdrawal



If you want to deactivate your account in STX Engine Web, please fill registered email address and click the button for confirmation.


Notice !


Your membership withdrawal has been completed!

Notice !


This member does not exist!

Notice !



Sign up is complete
To login, Press the Confirm button.